Otumara-Saghara-Escravos Gas pipleline SPDC | SAIPEM
Completed on
July, 2017
Status : achieved
SPDC/ SAIPEM CONTRACTING NIGERIA/ JCL
Supply of accommodation vessels, barges, light marine vessels.
A 42-kilometre-long pipeline, of various sizes ranging from 2 to 12 inch, and passing through a swampy terrain with a major river crossing, will collect about 30 million cubic feet a day of processed associated gas from the Otumara and Saghara fields in the western Niger Delta and send it through the Escravos-Lagos system to the domestic market, helping to reduce flaring, or the burning of gas produced alongside oil.