Design & Construction of 3 units Flat top Pontoons 25mx14mx2.0m carrying each 3x 1200KVA Gas Turbine Generator Sets (MV NPDC BATAN & MV NPDC JONES CREEK & MV NPDC EGWA) – LEE ENGINEERING SERVICES LIMITED/ NPDC (2013-2015)
Design & Construction of 1 unit Flat top Pontoon 20mx10mx2.0m carrying 2x 900KVA Caterpillar Diesel Generator Sets (PE614) – Python Engineering Company Limited/ PECL (2014)
Nigerian Westminster Dredging & Marine (NWDM)/ BOSKALIS Group (1996-2014):
Construction of Houseboats with different Capacities (4 units).
Statutory & Emergency Dry-Docking of multicat vessels, Barges & Houseboats with Different Capacities (Over 24 units).
Statutory & Emergency Dry-Docking of Cutter suction Dredgers (Over 4 units).
Construction of ready accommodations, offices, recreations, kitchens & messing units in addition to seting up of camps (over 30 units)
Provision of earth moving equipment (Excavators, Dozers, wheel loaders,…)
Marine Logistics
Provision of accommodations vessels, marine logistics & catering services at Awoba Rivers Southwest of Port Harcourt - Nigerian Westminster Dredging & Marine (NWDM)/ BOSKALIS Group (2012-2013)
Design & Construction of 9 units flat top & ramp barges /1000-2000 Tons- (JAD001-JAD009)- Jad Construction Limited (2007-2012)
Construction of Abigborodo Township road, Warri North LGA (2011-2012)
Dredging International (DI)/ DEME Group (2003-2011):
Construction Of Barges and Houseboats with different Capacities (5 units).
Statutory & Emergency Dry-Docking of Barges & Houseboats with Different Capacities (Over 15 units).
Statutory & Emergency Dry-Docking of Multicat vessels & Tugboats with Different Capacities (Over 8 units).
Marine Logistics
Shell Petroleum Development Company Of Nigeria Limited (SPDC) (2001-2010)::
Statutory & Emergency Dry-Docking of Barges & Houseboats with Different Capacities (Over 76 units).
Statutory & Emergency Dry-Docking of Tugboats with Different Capacities (Over 12 units).
Construction of ready accommodations, offices, recreations & messing units in addition to setting up of camps (over 200 units)
Inshore & Offshore Marine Logistics
Construction and supply of 2 accommodation units in accordance with CNL specifications –CHEVRON NIGERIA LIMITED (2010)
Construction of Ikpeyan Avenue Sapele, Sapele LGA (2009-2010)
Construction of Mayuku road phase1, Warri North LGA (2009-2010)
Design & Construction of 1 unit Ramp barge /1000 Tons- (SUKUNU1) – SUKUNU HYDRA CONCEPT LIMITED (2009)
Design & Construction of 1 unit 1000 Tons ramp barges- (A&E01) - A&E petrol Nigeria Limited
(2009)
Design & Construction of 2 units Ramp barges with spuds /750 Tons- (DELTA BLOSSOM & JASON BEBE) & 1 unit flat top/water barge /500 Tons- (SAINT AGNES) – TECON OIL SERVICES LTD – (2008-2009)
Design and construction of more than 50 units port A cabins for Escravos –EGTL (accommodations, offices, toilet units, laundry units, mechanical units,…) and erection of camps – SOUTHERN GAS CONSTRUCTORS/SGC (2006-2009)
Construction of Koko-Uba Egbemeleji road, Warri North LGA –(2007-2009)
Design & Construction of 1 unit flat top barge /1000 Tons- (DON PARKER) – DON PARKER NIG. LIMITED – (2008)
Design & Construction of 2 units mess/ office area Port A Cabins- NESTOIL LIMITED (2007)
Design & Construction of 2 units fuel barges/ 1000-1500 Tons -(PE607 & PE611) NESTOIL LIMITED (2006-2007)
Design & Construction of 2 units self-propelled/ 1000 Tons Ramp barges-(GURARA & AUCHI) Setraco Nig. Limited (2006-2007)
Design & Construction of 3 units Mud lab & utilities- BAROID FLUID SERVICES (2006)
Design & Construction of 5 units Port A Cabins- ADMOCS NIGERIA LIMITED (2005)
Outright purchase & statutory docking and restructuring of 2 units rock barges & converting to fuel barges (PE609-PE610)/ 3000 Tons – PYTHON ENG. CO. LTD (2004-2005)
Design & Construction of 2 unit Fuel barges /1000 Tons- (MORNING STAR01 & V-MARIA01) –BUVEL NIG. LTD – (2002-2003)
Construction of Guest House and Main entrance gates at Edjeba & Ogunu I.A for Shell/ Warri - Shell Petroleum development company-SPDC (2002-2003)
Construction of security building at Osubi airport/ Warri - Shell Petroleum development company-SPDC (2002)
Construction of pontoon, articulated bridge & platform jetty for Bonny Island, LNG Expansion project- EARTH MOVING INTERNATIONAL NIG. LTD /EMI/ TSKJN (2001-2002)
Construction and installation of 27 different Port A Cabin units and erection of structure on offshore barge JasconI- DIESEL POWER NIGERIA LIMITED (2001)
Design & Construction of Warehouse complex- Nigerian Westminster Dredging & Marine (NWDM)/ BOSKALIS Group (2000-2001)
Design & Construction of 50 Man Houseboat- DUMEZ NIGERIA LIMITED / ILE DE FRANCE (2000-2001)