Design, fabrication & Erection of NMA FM Accommodation camp
  • start
  • 20140901_110310
  • 20140915_113356
  • 20140915_112351
  • 20140901_105221
  • 20140901_105216
  • 20140321_163843
  • 20140322_174836
  • 20140322_174524
  • 20140322_174529
Completed on October, 2014
Status : achieved
CHEVRON NIGERIA LIMITED
Design, fabrication & Erection of NMA FM Accommodation camp/ Block 18/ 162 Man accommodation camp, made of 32 accommodation Port A Cabins units at Escravos